Friday, October 10, 2014

Connecting Tracks at Proviso... Turnout Replacement

I've been working on getting the tracks reconnected between the two sections that make up the main Proviso Yard.  Thirteen track need to be reconnected plus one turnout replaced.  So far I have three of the tracks reconnected and today, I've got the turnouts replaced.  I was able to replace the turnout on top of the Tortoise switch machine that stayed in place throughout the move.  I saved the turnout that I removed but was not able to use it so I had to build a new one.  Other than painting and ballasting, its good to go.


2 comments:

  1. you should upload another you tube video about your progress

    ReplyDelete
  2. almost time to go operational post on YouTube when ready

    ReplyDelete