Track laying progress is being made at the Rochelle Global 3 Intermodal yard. Twelve out of the seventeen turnouts have been installed. I Should be able to get the remaining track installed over the next few weeks. Below are two views, one looking westbound and the second looking eastbound.
The Gravel Pit
10 years ago


Daryl, it's looking good. How wide is the benchwork area there at Global 3?
ReplyDeleteIts 25" wide and 14 feet long. Eventually I will be adding a 6"-8" bumpout ikn the middle for the office and truck check in gate.
ReplyDeleteDaryl