Monday, August 31, 2009

Five Clinton Turnouts for Arrival / Departure Tracks


Spent the last week working on these five turnouts leading into the 2 arrival / departure tracks of the Clinton / Proviso yard. The two left hand tracks are the A/D tracks while the third track on the right will be a yard bypass track. The trackwork is designed to allow access to both tracks from both the yard ladder (lower right track) and the mainline lead (lower center track). Still have wiring to do. I hope to have that completed before labor day weekend. These five turnout raises the total to 53 completed out of 108 total.

The location of the turnouts on the layout are indicated in the track schematice below.

Monday, August 24, 2009

Turnouts 47 and 48 (out of 108 total)

Well, I'm closing in on the halfway point in building turnouts for the Geneva Subdivision. I finished two more for 47 & 48 and now only have 60 left to do. Six more and I will have officially hit the halfway point. I have to admit that building the mainline and staging yard turnouts was a little more rewarding since each time I got a couple done, it meant that I could extend the mainline that much further or add more trains to the layout. Now, with the mainline and staging yards complete, I am focusing my attention on the yards. There are so many yard turnouts one right next to the other. If you get two done, it just means you got two more to do right next to the two you just finished. As you can probably tell, I've fallen into the habit of building and installing two turnouts at a time. I think it was doing all the crossovers on the mainline that got me into that pattern. Anyway, I am forging ahead with Proviso/Clinton turnouts. My immediate goal is to get enough installed so that there can be some semblance of operations. This would require complete arrival and departure tracks, at least 4 or 5 yard tracks and 1 or 2 engine engine tracks. To get to this point, 15 to 20 more turnouts need to be constructed. At the rate of 2 turnouts a week, I should be at this point by Thanksgiving. Well enough bloviating. Back to constructing turnouts.

Monday, August 10, 2009

East Staging at Nelson Completed


Got the east staging yard at Nelson completed over the weekend. The east staging yard contains 5 tracks as opposed to only 4 for the west staging yard at Proviso/Clinton. As with the west yard, control of the turnouts is through a push button for each of the tracks that, when pushed, has all the turnouts properly set for a train to enter or leave that track. So far I'm at 44 turnouts installed. Six more and I'll be at the half way point. I only have three tortoises left from the Rochelle Sub layout. I'll have to order a 12 pack from MB Klien real soon. I think I will now focus my attention on the Proviso/Clinton Yard.

Thursday, July 23, 2009

Fox Valley Models Wheel Sets Going through Fast Tracks Crossover

This video shows just how smooth N scale trains can go through turnouts when you have high quality wheel sets and precision made Fast Tracks #10 turnouts. Two trains go though a crossover without the slightest bump, almost as if the turnouts weren't even there. The first train is a faster moving intermodal train. Not all the cars have Fox Valley Models wheel sets. The the second set (red) has Atlas medal wheel sets and the first truck bumps a bit going through. If I re-gauge the wheels in that truck, it will do better. That's now on my "to do" list. The second train is a slower moving manifest with 100% Fox Valley wheel sets. Completely smooth.


West Staging Track Installed




I've got the tracks down for the west staging tracks and was able to put some more trains on the layout. The west staging yard is partial in the open in Proviso/Clinton and partially in the staging room separating Proviso from Rochelle. The yard will hold eastbound trains heading out of Clinton and will receive westbound trains. The yard will also serve as interchange tracks for coal trains coming into and departing Proviso. The visible tracks from left to right are

3 Clinton staging tracks
1 Proviso Coal Train interchange track
2 Mainline Tracks
1 Yard drill track

The engines on the plywood are where the east side of the Proviso Engine servicing facilities will be.

Daryl

Sunday, July 19, 2009

Geneva Sub Trackplan

I don't really have a trackplan that I can post at this time. I do, however, have a schematic of the layout that I use on RR&Co software for signals and dispatcher use. Hope its helpful in seeing how the Geneva Sub is laid out and how things will be operated.