Spent the last week working on these five turnouts leading into the 2 arrival / departure tracks of the Clinton / Proviso yard. The two left hand tracks are the A/D tracks while the third track on the right will be a yard bypass track. The trackwork is designed to allow access to both tracks from both the yard ladder (lower right track) and the mainline lead (lower center track). Still have wiring to do. I hope to have that completed before labor day weekend. These five turnout raises the total to 53 completed out of 108 total.
The location of the turnouts on the layout are indicated in the track schematice below.
No comments:
Post a Comment