Monday, August 10, 2009

East Staging at Nelson Completed


Got the east staging yard at Nelson completed over the weekend. The east staging yard contains 5 tracks as opposed to only 4 for the west staging yard at Proviso/Clinton. As with the west yard, control of the turnouts is through a push button for each of the tracks that, when pushed, has all the turnouts properly set for a train to enter or leave that track. So far I'm at 44 turnouts installed. Six more and I'll be at the half way point. I only have three tortoises left from the Rochelle Sub layout. I'll have to order a 12 pack from MB Klien real soon. I think I will now focus my attention on the Proviso/Clinton Yard.

No comments:

Post a Comment