Monday, October 12, 2009

Six More Turnouts Installed

Building more turnouts. I think I am going to do two more and then move on to something else for a while. I'm getting burned out on building turnouts. I did add six more to complete the Proviso end of the yard. I still need to do six more to complete the Clinton side, three more for Proviso/Clinton industries and twelve more for the engine facilities. That's not to mention bunches more for Rochelle and Global III. Oh well. After two more turnouts, I think I work on the Rochelle backdrop and then completely scenic the Rock River crossing between Nelson and Franklin Grove.




Sunday, October 11, 2009

Commander Data builds a turnout

Just for fun, I made a video that condenses 42 minutes of work into 3 minutes. Would be nice if I could build em this fast. I know have 69 turnouts completed. I think I will do 2 more and than take a break from building turnouts for a while. I finally getting burned out on them.

Thursday, September 24, 2009

Proviso / Clinton Yard Progress Update

Here's the video I promise. I think this now puts me at 61 turnouts complete out of 108. Well over half way done. Yea!!! Its all downhill from here. Only 47 more to go.

Sunday, September 20, 2009

Proviso/Clinton Yard Taking Shape

With four turnouts added to both the Clinton side and the Proviso side, the yard us beginning to take shape. I'm hoping to post a video later tonight or this week.

Cheers!



Monday, August 31, 2009

Five Clinton Turnouts for Arrival / Departure Tracks


Spent the last week working on these five turnouts leading into the 2 arrival / departure tracks of the Clinton / Proviso yard. The two left hand tracks are the A/D tracks while the third track on the right will be a yard bypass track. The trackwork is designed to allow access to both tracks from both the yard ladder (lower right track) and the mainline lead (lower center track). Still have wiring to do. I hope to have that completed before labor day weekend. These five turnout raises the total to 53 completed out of 108 total.

The location of the turnouts on the layout are indicated in the track schematice below.

Monday, August 24, 2009

Turnouts 47 and 48 (out of 108 total)

Well, I'm closing in on the halfway point in building turnouts for the Geneva Subdivision. I finished two more for 47 & 48 and now only have 60 left to do. Six more and I will have officially hit the halfway point. I have to admit that building the mainline and staging yard turnouts was a little more rewarding since each time I got a couple done, it meant that I could extend the mainline that much further or add more trains to the layout. Now, with the mainline and staging yards complete, I am focusing my attention on the yards. There are so many yard turnouts one right next to the other. If you get two done, it just means you got two more to do right next to the two you just finished. As you can probably tell, I've fallen into the habit of building and installing two turnouts at a time. I think it was doing all the crossovers on the mainline that got me into that pattern. Anyway, I am forging ahead with Proviso/Clinton turnouts. My immediate goal is to get enough installed so that there can be some semblance of operations. This would require complete arrival and departure tracks, at least 4 or 5 yard tracks and 1 or 2 engine engine tracks. To get to this point, 15 to 20 more turnouts need to be constructed. At the rate of 2 turnouts a week, I should be at this point by Thanksgiving. Well enough bloviating. Back to constructing turnouts.

Monday, August 10, 2009

East Staging at Nelson Completed


Got the east staging yard at Nelson completed over the weekend. The east staging yard contains 5 tracks as opposed to only 4 for the west staging yard at Proviso/Clinton. As with the west yard, control of the turnouts is through a push button for each of the tracks that, when pushed, has all the turnouts properly set for a train to enter or leave that track. So far I'm at 44 turnouts installed. Six more and I'll be at the half way point. I only have three tortoises left from the Rochelle Sub layout. I'll have to order a 12 pack from MB Klien real soon. I think I will now focus my attention on the Proviso/Clinton Yard.