Sorry, nothing really new to report. I did video some coal trains running through proviso. Not really very happy with the focus though.
Monday, January 25, 2010
Track laying progress is being made at the Rochelle Global 3 Intermodal yard. Twelve out of the seventeen turnouts have been installed. I Should be able to get the remaining track installed over the next few weeks. Below are two views, one looking westbound and the second looking eastbound.
I am installing five additional turnouts for the Clinton, IA side of the yard. The turnouts are built and installed. However, I still need to install the tortoise machines and do a bunch of wiring. Should have that all done by the end of next weekend. Next up on the to do list is the backdrop in the other room. Christmas vacation is coming up so should be able to make progress on that and more.