Monday, January 25, 2010

Track laying progress is being made at the Rochelle Global 3 Intermodal yard. Twelve out of the seventeen turnouts have been installed. I Should be able to get the remaining track installed over the next few weeks. Below are two views, one looking westbound and the second looking eastbound.




2 comments:

  1. Daryl, it's looking good. How wide is the benchwork area there at Global 3?

    ReplyDelete
  2. Its 25" wide and 14 feet long. Eventually I will be adding a 6"-8" bumpout ikn the middle for the office and truck check in gate.

    Daryl

    ReplyDelete