I've been working on getting the tracks reconnected between the two sections that make up the main Proviso Yard.  Thirteen track need to be reconnected plus one turnout replaced.  So far I have three of the tracks reconnected and today, I've got the turnouts replaced.  I was able to replace the turnout on top of the Tortoise switch machine that stayed in place throughout the move.  I saved the turnout that I removed but was not able to use it so I had to build a new one.  Other than painting and ballasting, its good to go.
The Gravel Pit
9 years ago


 
 
you should upload another you tube video about your progress
ReplyDeletealmost time to go operational post on YouTube when ready
ReplyDelete