Wednesday, April 14, 2010

Four Engine Tracks for West end of Provo Loco Facility

Installed two of the four turnouts on the west end of the Proviso loco facility. This now gives four tracks for engine storage.   This weekend I hope to install the other two tunrouts on the east end to make four storage tracks from east to west.  Looking at the prototype photos again, I've decided on six total tracks for the facility.  Five of the tracks will run into the engine house while the sixth one will be outside the enginehouse for a fueling and sanding station.

3 comments:

  1. It looks great, have you begun work on the engine house yet?

    ReplyDelete
  2. No, that will come later. I'm now to the point where I have almost 100% of the track done so I will turn to scenery, bridges and buildings sometime this summer.

    ReplyDelete
  3. I like the way the tracks go up and over the road
    for tracks 2/3

    ReplyDelete