Sunday, February 21, 2010

Global III Load/Unload Tracks

Laid the track for the Global III load/unload tracks. These two tracks will be embedded into concrete paving and surrounded on both sides with blacktop as per the prototype. In the photo you can also see the four yard tracks and the double track mainline. The first yard track will be the arrival/departure track while the other three will be for storage and classification.


No comments:

Post a Comment