Track laying progress is being made at the Rochelle Global 3 Intermodal yard.  Twelve out of the seventeen turnouts have been installed.  I Should be able to get the remaining track installed over the next few weeks. Below are two views, one looking westbound and the second looking eastbound.
The Gravel Pit
9 years ago


 
 
Daryl, it's looking good. How wide is the benchwork area there at Global 3?
ReplyDeleteIts 25" wide and 14 feet long. Eventually I will be adding a 6"-8" bumpout ikn the middle for the office and truck check in gate.
ReplyDeleteDaryl