The Union Pacific N scale model railroad built by Daryl Kruse
Monday, August 10, 2009
East Staging at Nelson Completed
Got the east staging yard at Nelson completed over the weekend. The east staging yard contains 5 tracks as opposed to only 4 for the west staging yard at Proviso/Clinton. As with the west yard, control of the turnouts is through a push button for each of the tracks that, when pushed, has all the turnouts properly set for a train to enter or leave that track. So far I'm at 44 turnouts installed. Six more and I'll be at the half way point. I only have three tortoises left from the Rochelle Sub layout. I'll have to order a 12 pack from MB Klien real soon. I think I will now focus my attention on the Proviso/Clinton Yard.
No comments:
Post a Comment