I am installing five additional turnouts for the Clinton, IA side of the yard. The turnouts are built and installed. However, I still need to install the tortoise machines and do a bunch of wiring. Should have that all done by the end of next weekend. Next up on the to do list is the backdrop in the other room. Christmas vacation is coming up so should be able to make progress on that and more.
Building more turnouts. I think I am going to do two more and then move on to something else for a while. I'm getting burned out on building turnouts. I did add six more to complete the Proviso end of the yard. I still need to do six more to complete the Clinton side, three more for Proviso/Clinton industries and twelve more for the engine facilities. That's not to mention bunches more for Rochelle and Global III. Oh well. After two more turnouts, I think I work on the Rochelle backdrop and then completely scenic the Rock River crossing between Nelson and Franklin Grove.
Just for fun, I made a video that condenses 42 minutes of work into 3 minutes. Would be nice if I could build em this fast. I know have 69 turnouts completed. I think I will do 2 more and than take a break from building turnouts for a while. I finally getting burned out on them.
Here's the video I promise. I think this now puts me at 61 turnouts complete out of 108. Well over half way done. Yea!!! Its all downhill from here. Only 47 more to go.
With four turnouts added to both the Clinton side and the Proviso side, the yard us beginning to take shape. I'm hoping to post a video later tonight or this week.