I am installing five additional turnouts for the Clinton, IA side of the yard. The turnouts are built and installed. However, I still need to install the tortoise machines and do a bunch of wiring. Should have that all done by the end of next weekend. Next up on the to do list is the backdrop in the other room. Christmas vacation is coming up so should be able to make progress on that and more.
The Gravel Pit
8 years ago