tag:blogger.com,1999:blog-3057579729722284150.post7426895384704737..comments2023-11-16T02:22:14.253-06:00Comments on N Scale Union Pacific Railroad - Class I Midwest Model Railroading: Update with Lots of PhotosDaryl Krusehttp://www.blogger.com/profile/07429210448720655797noreply@blogger.comBlogger2125tag:blogger.com,1999:blog-3057579729722284150.post-40045600764800161932016-07-18T09:45:28.850-05:002016-07-18T09:45:28.850-05:00The CN bridge (former WC, SOO) just east of the st...The CN bridge (former WC, SOO) just east of the station in River Forest would be a convenient way to disguise a hole in the wall.cjm413https://www.blogger.com/profile/07845762518355361006noreply@blogger.comtag:blogger.com,1999:blog-3057579729722284150.post-57822488570931088932015-09-14T21:18:56.230-05:002015-09-14T21:18:56.230-05:00good work Daryl now the real work begins. in Clint...good work Daryl now the real work begins. in Clinton the tracks need ballast and scenery needs to be put down and farmland needs to be put in between Franklin Grove and the bridge plus ballasting. Global 3 Yard needs its tracks installed before you can move the intermodal trains from staging here. in Rochelle scenery needs to be installed and the signals hooked up and all the sidings on the BNSF side of the layout installed plus installation of crossings and roads. in Rock River backdrops need to be installed and the bridge itself installed plus a scene break to hide the hole. Wheaton the code 55 sectional track needs to be replaced with switches and a bypass track installed for the station plus sidings and the Canadian Pacific/ Canadian National interchange yard and industries. West Elhurst buildings need to be installed and a bridge needs placed at the east end along with crossovers at both ends of town. Proviso Yard scenery needs to be done and the old staging tracks need to be connected to the main this will serve as an on scene staging yard representing Global 2. in Maywood the tracks need to be attached so the East Local can get into the grainy and backdrops and a bridge installed plus a station along with scenery work. the final part that needs to be done is scenery work and and a backdrop representing Chicago has to be installed in River Forrest Yard which is the end of the line. good luck Daryl with the rebuild. Geomodelrailroaderhttps://www.blogger.com/profile/17032848176215977689noreply@blogger.com